60 square meters in 12 hours on an island in Norway in sporadic drizzle. 3 guys and a great crane operator lifting panels under and over wires and the chimney. 21 custom panels that took 4 days to glue and get ready to transport. The trip there from Malmö took longer than the installation

60 square meters in 12 hours on an island in Norway in sporadic drizzle. 3 guys and a great crane operator lifting panels under and over wires and the chimney. 21 custom panels that took 4 days to glue and get ready to transport. The trip there from Malmö took longer than the installation!! #csips #prefabhus #sipshouse #sipconstruction #sipsinsweden #sanwichpanel #platetheory #swedishhouses #prefabark #designbuild #smola #norway #väggblock #craneoperator #krankille #viavac #suction #scandinavianconstruction #buildingengineering

60 square meters in 12 hours on an island in Norway in sporadic drizzle. 3 guys and a great crane operator lifting panels under and over wires and the chimney. 21 custom panels that took 4 days to glue and get ready to transport.  The trip there from Malmö took longer than the installation

Instagram filter used: Normal

Photo taken at: Smøla (island)

View in Instagram ⇒